“TOFU PRODUCTION FACILITY LAYOUT REDESIGN USING SLP TO REDUCE MATERIAL HANDLING DISTANCE AND COST” (2026) Kohesi: Jurnal Sains dan Teknologi, 11(3). doi:https://doi.cibangsa.org/DOI-2026-14.